Transaction
Floor: 2
Flat:
B
SA: 1,411 ft2 (@ 21,545)
GFA: -
2026-05-29
$30.4 M
Floor: 11
Flat:
C
SA: 1,300 ft2 (@ 13,200)
GFA: -
2026-05-18
$17.16 M
Floor: 11
Flat:
C
SA: 1,067 ft2 (@ 14,067)
GFA: -
2026-05-12
$15.01 M
Floor: 15
Flat:
D
SA: 1,071 ft2 (@ 13,454)
GFA: -
2026-05-06
$14.41 M
Floor: 12
Flat:
C
SA: 1,232 ft2 (@ 15,673)
GFA: -
2026-04-10
$19.31 M
Floor: 3
Flat:
A
SA: 1,533 ft2 (@ 15,838)
GFA: -
2026-03-25
$24.28 M
Floor: 2
Flat:
B
SA: 1,411 ft2 (@ 21,495)
GFA: -
2026-03-11
$30.33 M
Floor: 9
Flat:
C
SA: 1,232 ft2 (@ 15,373)
GFA: -
2026-03-05
$18.94 M
Floor: 15
Flat:
C
SA: 1,232 ft2 (@ 15,771)
GFA: -
2026-03-04
$19.43 M
Floor: 15
Flat:
F
SA: 788 ft2 (@ 14,695)
GFA: -
2026-03-03
$11.58 M
Floor: 2
Flat:
A
SA: 1,329 ft2 (@ 21,497)
GFA: -
2026-02-20
$28.57 M
Floor: G
Flat:
B
SA: 1,014 ft2 (@ 3,698)
GFA: -
2026-01-26
$3.75 M
Floor: 8
Flat:
C
SA: 1,179 ft2 (@ 15,097)
GFA: -
2026-01-21
$17.8 M
Floor: 10
Flat:
D
SA: 1,504 ft2 (@ 15,292)
GFA: -
2026-01-16
$23 M
Floor: 10
Flat:
A
SA: 1,533 ft2 (@ 19,210)
GFA: -
2026-01-07
$29.45 M
Floor: B1
Park NO.:
P43
SA: 1,597 ft2 (@ 18,033)
GFA: -
2025-11-27
$28.8 M
Floor: 3
Flat:
A
SA: 1,597 ft2 (@ 18,033)
GFA: -
2025-11-27
$28.8 M
Floor: 11
Flat:
B
SA: 505 ft2 (@ 12,435)
GFA: -
2025-11-18
$6.28 M
Floor: B1
Park NO.:
P28
SA: 1,597 ft2 (@ 18,159)
GFA: -
2025-10-30
$29 M
Floor: 11
Flat:
A
SA: 1,597 ft2 (@ 18,159)
GFA: -
2025-10-30
$29 M
Floor: B2
Park NO.:
P502
SA: 1,067 ft2 (@ 13,120)
GFA: -
2025-10-10
$14 M
Floor: 8
Flat:
C
SA: 1,179 ft2 (@ 15,097)
GFA: -
2025-08-22
$17.8 M
Floor: 16
Flat:
B
SA: 1,411 ft2 (@ 15,237)
GFA: -
2025-08-19
$21.5 M
Floor: 16
Flat:
B
SA: 1,411 ft2 (@ 15,237)
GFA: -
2025-08-19
$21.5 M
Floor: 16
Flat:
A
SA: 1,597 ft2 (@ 17,532)
GFA: -
2025-08-19
$28 M
Floor: 3
Flat:
A
SA: 877 ft2 (@ 15,895)
GFA: -
2025-08-12
$13.94 M
Floor: 7
Flat:
D
SA: 1,046 ft2 (@ 14,694)
GFA: -
2025-08-01
$15.37 M